No, not the one in New York. This Fifth Avenue is a little closer to home.

The family needed more space and more comfort, but wanted it in style too. The house was given a two storey extension that incorporated a large, open-plan living space that has a real feel of having plenty of room. The glass doors leading out onto the new patio that we laid for them add greatly to this feeling of airy space.

Kitchen space was freed up by adding a very practical utility room in the extension area for all the day to day family tasks like laundry, leaving the kitchen free for cooking and being the heart of the home.

The extension added an extra bedroom and bathroom as well as a children's room. Upstairs, the nursery was refurbished and the whole job was finished by applying a coat of render to the property, so that the outside of this house will look as welcoming as the new, extended interior.

Get More Information

Image of two storey extension fifth avenue chelmsford 1016 <h2>2018-11-13 - Two storey extension in Fifth Avenue</h2>Image of two storey extension fifth avenue chelmsford 1024 <h2>2018-11-13 - Two storey extension in Fifth Avenue</h2>Image of house refurbishment montagu gdns 014 <h2>2018-11-13 - Two storey extension in Fifth Avenue</h2>Image of two storey extension fifth avenue chelmsford 1018 <h2>2018-11-13 - Two storey extension in Fifth Avenue</h2>Image of house refurbishment montagu gdns 022 <h2>2018-11-13 - Two storey extension in Fifth Avenue</h2>Image of two storey extension fifth avenue chelmsford 1012 <h2>2018-11-13 - Two storey extension in Fifth Avenue</h2>Image of single storey extension beaulieu park chelmsford 003 <h2>2018-11-13 - Two storey extension in Fifth Avenue</h2>Image of house refurbishment montagu gdns 011 <h2>2018-11-13 - Two storey extension in Fifth Avenue</h2>Image of house refurbishment montagu gdns 030 <h2>2018-11-13 - Two storey extension in Fifth Avenue</h2>Image of house refurbishment montagu gdns 025 <h2>2018-11-13 - Two storey extension in Fifth Avenue</h2>

One school of thought holds that your importance in an organisation is inversely proportional to the length of time you could lay dead on your office floor before anyone noticed any effect on the business.

The idea is that as you become more valuable, your role evolves to become more strategic and long term. The organisation should be self-managing to an extent in the shorter term.

With Craig in America for three weeks, it is slightly less dramatic, but nonetheless a good test of the theory. With the team that has built up at CWN over the years, current projects are all moving along nicely. For longer term ideas, please bear with us for a short while.

Get More Information

This picture is of a lightweight thermal concrete block. Take a good look, you may not see another for some time.

As one of the most widely used and most useful items in building, these things are just about everywhere. Sadly, the biggest supplier for the whole of the UK has halted production while a major change in manufacturing methods is implemented.

To overcome immediate difficulties, we have ordered in additional supplies, and hope that these will see us through while there is a drastic shortage. The moral of the story is that if you are planning any major works, be they new build, extension, garage conversion or repairs, talk to us sooner rather than later to make sure that we can come up with a realistic schedule for you.

Get More Information

If you live in a semi-detached house and need more space, a great way to avoid party wall issues and to help your extension project run smoothly, is to collaborate with your neighbours.

These two neighbours did just that and as a result both have created individually designed spacious open plan rooms with natural light, due to the use of roof lanterns and large folding sliding doors.

Both retain small differences where it counts, but an exterior that keeps the overall appearance of the two properties harmonious.

Get More Information

Image of 2016 02 08 Updates 5338 <h2>2016-02-12 - Teamwork brings a great result for neighbours</h2>Image of 2016 02 08 Updates 5330 <h2>2016-02-12 - Teamwork brings a great result for neighbours</h2>Image of 2016 02 08 Updates 5339 <h2>2016-02-12 - Teamwork brings a great result for neighbours</h2>Image of 2016 02 08 Updates 5336 <h2>2016-02-12 - Teamwork brings a great result for neighbours</h2>Image of 2016 02 08 Updates 5325 <h2>2016-02-12 - Teamwork brings a great result for neighbours</h2>Image of 2016 02 08 Updates 5340 <h2>2016-02-12 - Teamwork brings a great result for neighbours</h2>Image of 2016 02 08 Updates 5342 <h2>2016-02-12 - Teamwork brings a great result for neighbours</h2>Image of 2016 02 08 Updates 5343 <h2>2016-02-12 - Teamwork brings a great result for neighbours</h2>Image of 2016 02 08 Updates 5331 <h2>2016-02-12 - Teamwork brings a great result for neighbours</h2>Image of 2016 02 08 Updates 5334 <h2>2016-02-12 - Teamwork brings a great result for neighbours</h2>

This house was made over from top to bottom in our design team's latest interior design project.

Combining clean, modern lines with comfort and functionality, part of the overall brief was to simplify care and cleaning.

Get More Information

Image of 2016 01 23 Updates 5207 <h2>2016-01-24 - Top to bottom makeover in our design team's latest interior design project</h2>Image of 2016 01 23 Updates 5203 <h2>2016-01-24 - Top to bottom makeover in our design team's latest interior design project</h2>Image of 2016 01 23 Updates 5204 <h2>2016-01-24 - Top to bottom makeover in our design team's latest interior design project</h2>Image of 2016 01 23 Updates 5199 <h2>2016-01-24 - Top to bottom makeover in our design team's latest interior design project</h2>Image of 2016 01 23 Updates 5210 <h2>2016-01-24 - Top to bottom makeover in our design team's latest interior design project</h2>Image of 2016 01 23 Updates 5194 <h2>2016-01-24 - Top to bottom makeover in our design team's latest interior design project</h2>Image of 2016 01 23 Updates 5198 <h2>2016-01-24 - Top to bottom makeover in our design team's latest interior design project</h2>Image of 2016 01 23 Updates 5206 <h2>2016-01-24 - Top to bottom makeover in our design team's latest interior design project</h2>Image of 2016 01 23 Updates 5208 <h2>2016-01-24 - Top to bottom makeover in our design team's latest interior design project</h2>Image of 2016 01 23 Updates 5200 <h2>2016-01-24 - Top to bottom makeover in our design team's latest interior design project</h2>

Christmas is approaching fast. With it comes the visiting season. Family, friends and neighbours all get together at this time of year, sometimes expected, sometimes as a surprise.

It is a time of year when we all want our home to be at its very best so that visitors can be welcomed in the greatest possible comfort.

We are currently working flat out to get three projects finished in time for Christmas; two kitchens and a bathroom. This is going to be possible because of the great teamwork here at CWN. At the heart of this is a nucleus of people who will go the extra mile to get customers' work completed in the expected time. Also part of the team are the suppliers who deliver quality materials to the right place and at the right time. Thanks to this team effort, we can be confident that these customers will be enjoying their new facilities in good time for the festive season.

Get More Information

Image of 2015 12 04 kitchen 002 <h2>2015-12-04 - Christmas is a time to relax.  Until then, we will be very busy</h2>Image of 2015 12 04 kitchen 001 <h2>2015-12-04 - Christmas is a time to relax.  Until then, we will be very busy</h2>Image of 2015 12 04 kitchen 004 <h2>2015-12-04 - Christmas is a time to relax.  Until then, we will be very busy</h2>Image of 2015 12 04 bathroom 004 <h2>2015-12-04 - Christmas is a time to relax.  Until then, we will be very busy</h2>Image of 2015 12 04 bathroom 002 <h2>2015-12-04 - Christmas is a time to relax.  Until then, we will be very busy</h2>Image of 2015 12 04 kitchen 005 <h2>2015-12-04 - Christmas is a time to relax.  Until then, we will be very busy</h2>Image of 2015 12 04 bathroom 001 <h2>2015-12-04 - Christmas is a time to relax.  Until then, we will be very busy</h2>Image of 2015 12 04 bathroom 005 <h2>2015-12-04 - Christmas is a time to relax.  Until then, we will be very busy</h2>Image of 2015 12 04 kitchen 003 <h2>2015-12-04 - Christmas is a time to relax.  Until then, we will be very busy</h2>Image of 2015 12 04 bathroom 003 <h2>2015-12-04 - Christmas is a time to relax.  Until then, we will be very busy</h2>

This kitchen refurbishment was completed in just 20 working days, bang on schedule. Following an initial detailed consultation with the client and submitting design for their approval, our team and the customers kept in touch throughout to make sure that resources were in the right place for the right time. This is a vital part of the process, as in the early stages, some additional drainage works were found to be necessary. These were seamlessly incorporated into the programme without breaking stride or causing any delays.

Once the new floor had been laid, installation went smoothly, according to plan, with decorating and testing carried out to finish the job.

Our clients were delighted when their new kitchen was handed over. Everything was just as they had envisaged it and ready to cook their celebratory dinner as planned.

Get More Information

Image of 2015 10 21 kitchen refurbishment danbury 9 <h2>2015-10-23 - Teamwork and meticulous planning deliver jobs on time and within budget</h2>Image of 2015 10 21 kitchen refurbishment danbury 1 <h2>2015-10-23 - Teamwork and meticulous planning deliver jobs on time and within budget</h2>Image of 2015 10 21 kitchen refurbishment danbury 2 <h2>2015-10-23 - Teamwork and meticulous planning deliver jobs on time and within budget</h2>Image of 2015 10 21 kitchen refurbishment danbury 4 <h2>2015-10-23 - Teamwork and meticulous planning deliver jobs on time and within budget</h2>Image of 2015 10 21 kitchen refurbishment danbury 8 <h2>2015-10-23 - Teamwork and meticulous planning deliver jobs on time and within budget</h2>Image of 2015 10 21 kitchen refurbishment danbury 20 <h2>2015-10-23 - Teamwork and meticulous planning deliver jobs on time and within budget</h2>Image of 2015 10 21 kitchen refurbishment danbury 7 <h2>2015-10-23 - Teamwork and meticulous planning deliver jobs on time and within budget</h2>Image of 2015 10 21 kitchen refurbishment danbury 18 <h2>2015-10-23 - Teamwork and meticulous planning deliver jobs on time and within budget</h2>Image of 2015 10 21 kitchen refurbishment danbury 16 <h2>2015-10-23 - Teamwork and meticulous planning deliver jobs on time and within budget</h2>Image of 2015 10 21 kitchen refurbishment danbury 3 <h2>2015-10-23 - Teamwork and meticulous planning deliver jobs on time and within budget</h2>

It is great to be busy, and we wish to say thank you to all our customers for keeping us on our toes.

With every increase in business comes the need for more careful monitoring of all processes and relationships within a company. Someone has to make sure that the right resources arrive in the right place at the right time, so that jobs can be completed to the highest standards, on time and within budget.

Introducing Josh Milgate, a young graduate who is going to play a key role in helping all these things happen here at CWN Construction Ltd.. Josh is providing the vital link between site and office, keeping the flow of information continuous.

This has already proved to be a great help in predicting and avoiding potential problems, preventing delays and inconvenience to customers, making sure that time on site is time well spent.

Every building project can be subject to external forces, but with good planning and sound communication channels in place, projects can be kept on track and costly delays avoided. We are looking forward to working with Josh on many projects to come.

Get More Information

With a busy life and two young boys to look after, this family needs to make the most of every minute, including time in the bathroom. Having a separate shower and bath was very important to them in achieving this, but the shape of the room didn't lend itself well to that configuration.

Our solution was to put the shower in front of the bath, separating the two from the rest of the room with a glass screen. The shower itself is a modern, digital unit that has a remote control to allow setting from inside or outside the shower area.

To save space, the bath has an overflow infill and a hand shower fitted to its rim. The hand shower reaches both the bath and the shower space for the greatest flexibility.

With everyone wanting to get ready for work, school and playgroup at the same time in the mornings, time is of the essence, so we installed a double sink with two taps for greater family coexistence and time saving in the mornings.

For quick drying and greater comfort, the bathroom was fitted with underfloor heating. Our client is over the moon with the results in terms of efficiency, comfort and style. If you want to make better use of the space you have and make your home more efficient, comfortable and enjoyable, give our design team a call on the number shown above or click in the header of any page to send an email.

Get More Information

Image of 2015 05 28 bathroom 010 <h2>2015-05-28 - This bathroom makes the most of available space</h2>Image of 2015 05 28 bathroom 012 <h2>2015-05-28 - This bathroom makes the most of available space</h2>Image of 2015 05 28 bathroom 008 <h2>2015-05-28 - This bathroom makes the most of available space</h2>Image of 2015 05 28 bathroom 006 <h2>2015-05-28 - This bathroom makes the most of available space</h2>Image of 2015 05 28 bathroom 007 <h2>2015-05-28 - This bathroom makes the most of available space</h2>Image of 2015 05 28 bathroom 003 <h2>2015-05-28 - This bathroom makes the most of available space</h2>Image of 2015 05 28 bathroom 002 <h2>2015-05-28 - This bathroom makes the most of available space</h2>Image of 2015 05 28 bathroom 009 <h2>2015-05-28 - This bathroom makes the most of available space</h2>Image of 2015 05 28 bathroom 001 <h2>2015-05-28 - This bathroom makes the most of available space</h2>Image of 2015 05 28 bathroom 005 <h2>2015-05-28 - This bathroom makes the most of available space</h2>

More to the point, is it practical? This example of form over function from Boston, Massachusets illustrates what can happen when appearance can lead the unwary into a poor choice.

The John Hancock Tower in Boston, was built in 1968 as an example of what could be achieved at the time with stunning materials. Blue reflective glass was chosen for the 10,344 window panes that formed the entire outer surface of the building.

Five years later though, the choice proved to be a poor one. The differential expansion rates of the glass and the building's steel frame caused stress fractures, allowing complete panes of glass to detach from the building and crash to the pavement below.

It got so bad that if the wind reached 45MPH, the police had to close the pavement to the public.

It took months to replace all the window panes at huge expense, not only in terms of money, but in terms of reputation; the sheets of plywood that replaced the windows while work went on, earned it the nickname "The Plywood "Palace".

If you are considering building projects, dreams and ideas, a conversation with CWN Construction can help to make sure that your choices are not only the most beautiful in your home, but also the most practical and durable. Call us for an informal, no-obligation chat, or click in the header of any page to get the ball rolling.

Get More Information

This week in building history, this happened. In March, 1973, there was a massive collapse at the Skyline Plaza complex in Bailey's Crossroads, Virginia, USA. One of the complex's towering apartment buildings collapsed, leaving a huge, eerie cloud of dust and debris where it once stood.

Surprisingly, the building wasn't even completed at the time, being due to open that August.

The investigation found no flaws in the design or materials, but the forms supporting the concrete columns on the 22nd floor were prematurely removed. The cement hadn't yet hardened completely and couldn't bear the weight of the 23rd floor.

The failure of these columns put an increased amount of pressure on the rest of the columns on the 23rd floor until the entire floor buckled and slammed down on the floor below. The building had not been engineered to withstand such a huge increased load, and the tremendous weight proved catastrophic. Each floor gradually succumbed and plummeted onto the story below in a devastating ripple effect.

Fourteen construction workers died and 34 were injured in the tragedy. Michael Hill, 31, ran all the way down the stairs from the 23rd floor when he saw cracks appear in the ceiling. He made it to the fourth floor when he was forced to jump out of a window. He broke both his arms but survived.

From such horrendous stories, we continue to learn that any construction project, from the smallest to the largest is all about patience and making sure that everything happens in sequence and at the right time. With the years of experience that CWN Construction brings to bear whenever we are involved, you can entrust your extension, conversion or new build to us in confidence. Call us now or click in the header of any page to send us an email and talk over your project.

Get More Information

Occasinoally, looking back on how things have gone wrong in building history can help remind us why we do things the way we do. On this day in 1919, the Purity Distilling Company of Boston fell foul of poor project management and quality assurance in an unimaginably awful way. Their 2.3 million gallon molasses tank burst, creating a tidal wave of some 11,818 tonnes of molasses, which engulfed the local area with loss of life and untold damage to property and to business.

It seems that despite spending $30,000 on its contstruction, Purity's parent company insisted on a short cut. The accepted practice after building such a tank was to fill it with water and test its integrity. However, with a shipment of molasses due to arrive just days after the completion of the tank, the decision was handed down to commission the tank without testing. The consequences are a matter of history.

So, what is the moral of this sad story? It is quite simply that no matter how pressing external contstraints may be, in the matter of building, there is no excuse to ever take a short cut. By using good project management practices, problems can be avoided and schedules can be met. Talk to us about any building projects you have in mind in the knowledge that every stage will be completed to perfection.

Get More Information

Hurrah! It's 2015 and we have posted some new project photos. Our hectic schedule and exciting current projects have left us no time for the 'blog, but we are back with a vengeance.

If you are seeking inspiration for a project on your own home, take a look at our projects page.

Get More Information

Image of Extension Galleywood 006 <h2>2015-01-28 - Thank you to all our customers for another great year</h2>Image of Kitchen Refurb Notley  IMG 3817 <h2>2015-01-28 - Thank you to all our customers for another great year</h2>Image of Kitchen Refurbishment Chelmsford 005 <h2>2015-01-28 - Thank you to all our customers for another great year</h2>Image of Extension Galleywood 003 <h2>2015-01-28 - Thank you to all our customers for another great year</h2>Image of Kitchen Refurbishment Chelmsford 014 <h2>2015-01-28 - Thank you to all our customers for another great year</h2>Image of Extension Galleywood 007 <h2>2015-01-28 - Thank you to all our customers for another great year</h2>Image of Kitchen Refurbishment Chelmsford 001 <h2>2015-01-28 - Thank you to all our customers for another great year</h2>Image of Kitchen Refurbishment Chelmsford 006 <h2>2015-01-28 - Thank you to all our customers for another great year</h2>Image of Extension Galleywood 001 <h2>2015-01-28 - Thank you to all our customers for another great year</h2>Image of Kitchen Refurb Notley IMG 3810 <h2>2015-01-28 - Thank you to all our customers for another great year</h2>

Since opening our new office and relaunching the CWN Construction website we have been inundated with new work. The response has been just amazing and we have been running at, or close to capacity ever since.

Thank you to all our customers for making this happy situation possible. We will look forward to many more busy times to come.

The thing that there hasn't been time for is keeping our 'blog up to date, so there hasn't been much to look at in here for a little while. We will be updating this in the coming weeks with photographs and stories from the projects that have been keeping us so wonderfully busy.

Right now, we are working hard to get all our current projects finished and handed over before Christmas so that our customers can enjoy the festive season in their newly built or extended homes. We want all our customers' homes to be ready to welcome guests.

There are already projects lining up to be started in the new year, so we are looking forward to getting those under way. If you have a building project in mind and want to get a first class job done with minimum fuss, call us on the number shown or click in the header of any page to send us an email to start talking over your plans. Whether you want to create a patio or embark on a new build project you will be just as welcome at our office where we can spread out and look at your plans in comfort.

Get More Information

This en-suite and bathroom project is taking shape now. The floor and wall tiles have been laid in the bathroom, using light coloured textured porcelain tiles on the walls around the 'L' shaped bath and shower, to contrast with black porcelain tiles on the floor and outside wall. The black tiles are polished in situ to give a stunning, lustrous surface that is smooth yet natural loooking.

Nice touches include the niches built into the walls for storage to preserve space and make it easier to reach bath products when showering or bathing. The natural wood cabinet and basin surround contrast with the tiled surfaces, complementing the textures and enhancing the feeling of warmth in the room.

The plumbing is all in place now, as are the electrical fittings give subtle, energy efficient lighting just where it is needed. With only detailing and the finishing touches to do now, our customers will soon be using their bathroom and en suite.

Get More Information

Image of 2014 07 30 en suite 008 <h2>2014-07-31 - Bathroom and en-suite project is near to completion</h2>Image of 2014 07 30 en suite 007 <h2>2014-07-31 - Bathroom and en-suite project is near to completion</h2>Image of 2014 07 30 en suite floor 001 <h2>2014-07-31 - Bathroom and en-suite project is near to completion</h2>Image of 2014 07 30 en suite 002 <h2>2014-07-31 - Bathroom and en-suite project is near to completion</h2>Image of 2014 07 30 en suite 010 <h2>2014-07-31 - Bathroom and en-suite project is near to completion</h2>Image of en suite floor stone tiles composite 001 <h2>2014-07-31 - Bathroom and en-suite project is near to completion</h2>Image of 2014 07 30 en suite 003 <h2>2014-07-31 - Bathroom and en-suite project is near to completion</h2>Image of 2014 07 30 en suite floor 002 <h2>2014-07-31 - Bathroom and en-suite project is near to completion</h2>Image of 2014 07 30 en suite 001 <h2>2014-07-31 - Bathroom and en-suite project is near to completion</h2>Image of 2014 07 30 en suite 009 <h2>2014-07-31 - Bathroom and en-suite project is near to completion</h2>

This customer wants to make the best possible use of space in a bathroom and en-suite facility, so our in-house design team was called upon to come up with something a little special. Using the CGI design facilities to their best effect, this is what we came up with.

The unusual 'L' shaped corner bath gives a feeling of space to the shower area while getting the best possible layout for the room available in the bathroom. This contrasts vividly with the space-saving curved shower cubicle and basin used in the en-suite to get the most comfort while leaving a good floor space to move around in.

Work has now started on both rooms and the images show the black, natural stone floor tiles in place, with wall tiling in progress and all the plumbing installed and ready to join up when the bathroom is finally fitted out.

The shower cubicle, basin and toilet have all been fitted in the en-suite facility and the walls are tiled. The space saving cupboards and vertical radiator will be in soon along with the shower unit, so our customers will soon be enjoying the convenience of their en-suite shower room.

Get More Information

Image of 2014 07 10 en suite work in progress 001 <h2>2014-07-11 - New bathroom and en-suite facilities</h2>Image of 2014 07 10 en suite work in progress 002 <h2>2014-07-11 - New bathroom and en-suite facilities</h2>Image of 2014 07 10 bathroom work in progress 001 <h2>2014-07-11 - New bathroom and en-suite facilities</h2>Image of 2014 07 10 bathroom work in progress 002 <h2>2014-07-11 - New bathroom and en-suite facilities</h2>Image of 2014 07 10 en suite cad image <h2>2014-07-11 - New bathroom and en-suite facilities</h2>Image of 2014 07 10 bathroom work in progress 003 <h2>2014-07-11 - New bathroom and en-suite facilities</h2>Image of 2014 07 10 en suite work in progress 003 <h2>2014-07-11 - New bathroom and en-suite facilities</h2>

This week, CWN Construction secured the order to build a new school classroom. With the summer holiday on its way, the school has a very limited time within which the new classroom must be built.

With the added complications of the school being on a main road and having no suitable parking for vehicles or skips, the orgaisation and scheduling of stages within the task are of paramount importance.

As with all work for schools the contract was placed following a competitive tendering process. This is not just about cost, but it is about value and competence. Because CWN Construction was able to demonstrate a solid track record of managing projects to strict deadlines and working to the letter of customers' requirements, the contract was awarded.

Of course, it is not just schools that have tight timescales. The same attention to detail and dedication to getting the job done on time and within budget is applied to every project we undertake. Call us now on the number shown above or click in the header of any page to send us an email about your building projects.

Get More Information

You may have to look closely to see the difference, but it was important to our customer so it was important to us. Originally, this dresser had oak shelves, sides and back internally.

Once the job was finished and the dresser installed, our customer found it a little dark, so we changed it for her. The shelves are still oak, but the sides and back have been painted in the same light colour as the outside, which now gives the space a much lighter and airier feel.

It is this kind of attention to detail that we pride ourselves on at CWN. Only when you have a kitchen, extension, conversion or new house that you are entirely happy with, do we consider the job done.

Little things mean a lot.

Get More Information

Every building project is about teamwork. From start to finish, everyone has to play their part and get their part of the job done before the next piece goes into the jigsaw.

At CWN Construction Ltd., we are particularly proud of our team. Over the years, the people have come together, bringing their skills to bear on our customers' extensions, conversions, refurbishments, repairs and new build projects. It is thanks to these people that we are able to manage a number of projects at any given time, being able to rely on the right tradesman turning up in the right place at the right time.

To all our planners and architects, interior designers, groundworkers, structural engineers, bricklayers, plasterers, carpenters, plumbers, electricians and roofers, we thank you for efforts in the past and look forward to many more successful projects in the future.

To find out more about how our teamwork can help make your plans a reality in the shortest possible time with the minimum of disruption, call us now or click in the header of any page to send an email.

Get More Information

Image of 2014 05 15 building teamwork 005 <h2>2014-05-15 - Teamwork is the key to success in any building project</h2>Image of 2014 05 15 building teamwork 001 <h2>2014-05-15 - Teamwork is the key to success in any building project</h2>Image of 2014 05 15 building teamwork 010 <h2>2014-05-15 - Teamwork is the key to success in any building project</h2>Image of 2014 05 15 building teamwork 002 <h2>2014-05-15 - Teamwork is the key to success in any building project</h2>Image of 2014 05 15 building teamwork 012 <h2>2014-05-15 - Teamwork is the key to success in any building project</h2>Image of 2014 05 15 building teamwork 003 <h2>2014-05-15 - Teamwork is the key to success in any building project</h2>Image of 2014 05 15 building teamwork 004 <h2>2014-05-15 - Teamwork is the key to success in any building project</h2>Image of 2014 05 15 building teamwork 006 <h2>2014-05-15 - Teamwork is the key to success in any building project</h2>Image of 2014 05 15 building teamwork 011 <h2>2014-05-15 - Teamwork is the key to success in any building project</h2>Image of 2014 05 15 building teamwork 007 <h2>2014-05-15 - Teamwork is the key to success in any building project</h2>

Here is our customer enjoying her new kitchen. The result is just as the family had planned with us back in March using our CGI kitchen design system.

Using custom built units with bespoke doors, drawer fronts and a bespoke quartz work surface meant that there was an investment of time while they were made, but the finished kitchen shows that the wait was worthwhile.

This family now has a unique, spacious and airy kitchen that will stay beautiful for years because it has been built to last using the best available materials, following a meticulous plan.

To make your home fit your needs, family and dreams, call us on the number shown above or click in the header of any page to send us an email. Our office is always open and personal callers are very welcome to call in and discuss plans or projects.

Get More Information

Image of 2014 04 28 finished kitchen 008 <h2>2014-05-01 - Beautiful kitchens make for happy customers</h2>Image of 2014 04 28 finished kitchen 001 <h2>2014-05-01 - Beautiful kitchens make for happy customers</h2>Image of 2014 04 28 finished kitchen 010 <h2>2014-05-01 - Beautiful kitchens make for happy customers</h2>Image of 2014 04 28 finished kitchen 009 <h2>2014-05-01 - Beautiful kitchens make for happy customers</h2>Image of 2014 04 28 finished kitchen 002 <h2>2014-05-01 - Beautiful kitchens make for happy customers</h2>Image of 2014 04 28 finished kitchen 007 <h2>2014-05-01 - Beautiful kitchens make for happy customers</h2>Image of 2014 04 28 finished kitchen 004 <h2>2014-05-01 - Beautiful kitchens make for happy customers</h2>Image of 2014 06 03 dresser 001 <h2>2014-05-01 - Beautiful kitchens make for happy customers</h2>Image of 2014 04 28 finished kitchen 014 <h2>2014-05-01 - Beautiful kitchens make for happy customers</h2>Image of 2014 04 28 finished kitchen 011 <h2>2014-05-01 - Beautiful kitchens make for happy customers</h2>

Nothing to do with Colonel Mustard or the Cluedo crew this time though. The family are so delighted with the new stone floor that runs throughout the lower storey of their house now, that they just couldn't wait to start using it.

While we work on the kitchen and utility room, the family has been able to get their conservatory furniture back in and start using the room again, just in time for the nice weather which makes sitting in a conservatory such a pleasure.

Get More Information

Image of moved into conservatory 003 <h2>2014-04-15 - In the conservatory again</h2>Image of moved into conservatory 001 <h2>2014-04-15 - In the conservatory again</h2>

The kitchen units specified by out customers have arrived now and are unpacked, ready for the kitchen fitter to put them in place. In keeping with the overall design brief, these are in natural wood finish, to be fitted with bespoke doors and drawer fronts in complementary colours to contrast subtly with the natural stone floor.

On seeing the new kitchen fittings for the first time, the lady of the household was delighted and could hardly stop herself beaming smiles at all and sundry.

We are looking forward to the reaction when all is in place and working! The kitchen fitting team is hard at it right now, so it shouldn't be long before the room takes shape.

Get More Information

Image of new kitchen units fitting 001 2 <h2>2014-04-14 - Meanwhile in the kitchen...</h2>Image of new kitchen units delivery 005 <h2>2014-04-14 - Meanwhile in the kitchen...</h2>Image of new kitchen units delivery 001 <h2>2014-04-14 - Meanwhile in the kitchen...</h2>Image of new kitchen units delivery 003 <h2>2014-04-14 - Meanwhile in the kitchen...</h2>Image of new kitchen units delivery 006 <h2>2014-04-14 - Meanwhile in the kitchen...</h2>Image of new kitchen units fitting 001 <h2>2014-04-14 - Meanwhile in the kitchen...</h2>Image of new kitchen units delivery 004 <h2>2014-04-14 - Meanwhile in the kitchen...</h2>Image of new kitchen units delivery 002 <h2>2014-04-14 - Meanwhile in the kitchen...</h2>

When carrying out any building work, from a small repair to an extension or complete refurbishment, we never forget that life goes on for the family that has trusted us to work on their home.

With the thousand and one items that accumulate in a kitchen, huge storage problems can arise when that part of your home is being altered. To keep disruption to a minimum, the larder and utility room were given a high priority, so that everyday living can be as close to normal as possible.

It is only a small thing, we know, but to have the ability back quickly to carry on with the family laundry, not constantly fall over everything, and to make a cup of tea can make a big difference when the project is lasting several weeks.

Get More Information

Image of utility room fitting out 002 <h2>2014-04-14 - Using the utility room</h2>Image of utility room fitting out 001 <h2>2014-04-14 - Using the utility room</h2>

With the stone floor laid, sealed and polished, last week we had the electrician and the carpenter doing their stuff in the new kitchen and utility room.

The lighting is now all in place and shows up with beautiful catch lights in the natural stone floor.

The carpenter has finished the skirtings, door frames and doors now, and started to fit out spaces like the larder and the utility room.

Watch this space for more progress as it happens.

Get More Information

Image of 2014 04 08 stone floor finished 006 <h2>2014-04-10 - Stone floor finished, skirting boards in place and fitting out started</h2>Image of 2014 04 08 stone floor finished 002 <h2>2014-04-10 - Stone floor finished, skirting boards in place and fitting out started</h2>Image of 2014 04 08 stone floor finished 003 <h2>2014-04-10 - Stone floor finished, skirting boards in place and fitting out started</h2>Image of 2014 04 08 stone floor finished 001 <h2>2014-04-10 - Stone floor finished, skirting boards in place and fitting out started</h2>Image of 2014 04 08 stone floor finished 004 <h2>2014-04-10 - Stone floor finished, skirting boards in place and fitting out started</h2>Image of 2014 04 08 stone floor finished 005 <h2>2014-04-10 - Stone floor finished, skirting boards in place and fitting out started</h2>

Now that the floor has been laid throughout the lower storey of this building, the rest of the trades team can get in and fit the items necessary to make this a highly functional kitchen and utility room layout.

This week, our carpenter has been in fitting the doors, door frames and skirting boards, ready for decorating, and our electrician has been putting all the wiring, sockets and junction boxes in place for the myriad pieces of electrical apparatus that are essential in any modern kitchen.

The other great essential in a kitchen is light where and when you need it, both to make the use of the room possible, but also to enhance the feeling of space and relaxed efficiency. Effective lighting can make the world of difference to any room, and has been at the heart of our plans for this kitchen installation from the outset.

Our electrician is seen in the photographs installing the strategically placed downlighters and the extractor fan. Watch this space for more progress as our latest project really starts to take shape.

Get More Information

Image of 2014 04 02 carpenter new kitchen 002 <h2>2014-04-04 - The floor is down, the ceiling is up - now we can proceed</h2>Image of 2014 04 02 carpenter new kitchen 003 <h2>2014-04-04 - The floor is down, the ceiling is up - now we can proceed</h2>Image of 2014 04 02 electrician new kitchen 002 <h2>2014-04-04 - The floor is down, the ceiling is up - now we can proceed</h2>Image of 2014 04 02 electrician new kitchen 005 <h2>2014-04-04 - The floor is down, the ceiling is up - now we can proceed</h2>Image of 2014 04 02 electrician new kitchen 001 <h2>2014-04-04 - The floor is down, the ceiling is up - now we can proceed</h2>Image of 2014 04 02 electrician new kitchen 003 <h2>2014-04-04 - The floor is down, the ceiling is up - now we can proceed</h2>Image of 2014 04 02 carpenter new kitchen 001 <h2>2014-04-04 - The floor is down, the ceiling is up - now we can proceed</h2>Image of 2014 04 02 electrician new kitchen 004 <h2>2014-04-04 - The floor is down, the ceiling is up - now we can proceed</h2>

To begin at the beginning, now that the room shapes are finalised, the floor can be laid. Once that is done, we have a sound foundation for the rest of the work.

This will be a most beautiful floor, using natural stone tiles that first have to be laid, then sealed, grouted and sealed again to get a perfect finish that will last for years.

Our customers have specified the same tiles not just for the new kitchen and utility room, but throughout the ground floor of the house, making a lovely, continuous stone surface with natural lustre.

These pictures were taken while our flooring team were applying the tiles to the levelled surface and cutting them in to the existing shapes like the newel post at the bottom of the stairs. This makes a more craftsman like finish to the job, with every tile fitted perfectly, leaving a minimum of space for expansion that will need grout.

Even the cat is impressed!

Get More Information

Image of floor tiles being laid 001 <h2>2014-03-27 - Kitchens are like life, you get the best resiults when you start at the bottom</h2>Image of floor tiles being laid 009 <h2>2014-03-27 - Kitchens are like life, you get the best resiults when you start at the bottom</h2>Image of floor tilies ready to lay 001 <h2>2014-03-27 - Kitchens are like life, you get the best resiults when you start at the bottom</h2>Image of floor tiles being laid 004 <h2>2014-03-27 - Kitchens are like life, you get the best resiults when you start at the bottom</h2>Image of floor tiles being laid 007 <h2>2014-03-27 - Kitchens are like life, you get the best resiults when you start at the bottom</h2>Image of flooor tiles being laid 002 <h2>2014-03-27 - Kitchens are like life, you get the best resiults when you start at the bottom</h2>Image of floor tiles being laid 008 <h2>2014-03-27 - Kitchens are like life, you get the best resiults when you start at the bottom</h2>Image of floor tiles beimg laid 006 <h2>2014-03-27 - Kitchens are like life, you get the best resiults when you start at the bottom</h2>Image of floor tiles being laid 003 <h2>2014-03-27 - Kitchens are like life, you get the best resiults when you start at the bottom</h2>

Since last week's update, the floors have been levelled and are ready for tiling, the electrical sockets have been fitted and all changes to the room shape have been completed.

This is where the weeks of planning start to pay off and our customers can see the computer generated designs turning into reality.

The lovely stone floor tiles will be laid next, then work can start on fitting out the interior and installing the appliances, both in the kitchen and in the new utility room, which has been partitioned off to keep the end result nice and tidy.

Get More Information

Image of 2014 03 18 kitchen utility room floor preparation 001 <h2>2014-03-19 - The kitchen and utility room start to take shape</h2>Image of 2014 03 18 kitchen utility room wall preparation 005 <h2>2014-03-19 - The kitchen and utility room start to take shape</h2>Image of 2014 03 18 kitchen utility room wall preparation 004 <h2>2014-03-19 - The kitchen and utility room start to take shape</h2>Image of 2014 03 18 kitchen utility room floor preparation 002 <h2>2014-03-19 - The kitchen and utility room start to take shape</h2>Image of 2014 03 18 kitchen utility room wall preparation 001 <h2>2014-03-19 - The kitchen and utility room start to take shape</h2>Image of 2014 03 18 kitchen utility room floor preparation 003 <h2>2014-03-19 - The kitchen and utility room start to take shape</h2>Image of 2014 03 18 kitchen utility room floor preparation 005 <h2>2014-03-19 - The kitchen and utility room start to take shape</h2>Image of 2014 03 18 kitchen utility room wall preparation 003 <h2>2014-03-19 - The kitchen and utility room start to take shape</h2>Image of 2014 03 18 kitchen utility room floor preparation 006 <h2>2014-03-19 - The kitchen and utility room start to take shape</h2>Image of 2014 03 18 kitchen utility room wall preparation 006 <h2>2014-03-19 - The kitchen and utility room start to take shape</h2>

This week we started work on the remodelling and refurbishment of a kitchen and utility room. The aim was to make the most of available space and give the family more room to enjoy their kitchen and do the daily chores with the greatest possible convenience.

Careful planning was carried out in partnership with our customers to make sure that everything will be installed in the most ergonomic and space efficient position to give a feeling of light and air without extending or taking up any more of the property's footprint.

The plans and quotation have been accepted now so work has started on preparing the room. So far, everything has been stripped back, a new partition wall built and the wiring for lighting and appliances in the new kitchen and utility room is going in. New, high-efficiency space saving radiators have been installed too. The job is progressing apace, so keep an eye on this page for updates.

Get More Information

Image of 2014 03 10 kitchen utility room planning 001 <h2>2014-03-12 - Remodelling of kitchen and utility room</h2>Image of 2014 03 10 kitchen utility room planning 002 <h2>2014-03-12 - Remodelling of kitchen and utility room</h2>Image of 2014 03 10 kitchen utility room planning 004 <h2>2014-03-12 - Remodelling of kitchen and utility room</h2>Image of 2014 03 10 kitchen utility room refurbishment 002 <h2>2014-03-12 - Remodelling of kitchen and utility room</h2>Image of 2014 03 10 kitchen utility room refurbishment 001 <h2>2014-03-12 - Remodelling of kitchen and utility room</h2>Image of 2014 03 10 kitchen utility room planning 003 <h2>2014-03-12 - Remodelling of kitchen and utility room</h2>Image of 2014 03 10 kitchen utility room refurbishment 003 <h2>2014-03-12 - Remodelling of kitchen and utility room</h2>Image of 2014 03 10 kitchen utility room refurbishment 005 <h2>2014-03-12 - Remodelling of kitchen and utility room</h2>Image of 2014 03 10 kitchen utility room refurbishment 004 <h2>2014-03-12 - Remodelling of kitchen and utility room</h2>

When we were asked to create a new shower room/wetroom for a customer in Orford Crescent, Chelmsford, it came with some additional challenges. The customer has mobility issues, so in addition to making the best use of the space available, the layout had to take this into account with the most convenient positioning of bathroom furniture, towel rails and storage.

Additionally, handrails and a shower seat were installed to make it as easy and safe to use as it could be. Non-slip flooring was used throughout and all surface materials were chosen for ease of cleaning to keep maintenance low. The heated towel rail both heats the room and keeps the towels nice and warm while taking up the minimum of space.

The planning was all done in collaboration with our customer to make sure that the end result was perfect for their needs and they are delighted with the result.

Get More Information

Image of 2014 03 10 orford crescent mobility bathroom 4 <h2>2014-03-10 - Wetroom installation in Chelmsford</h2>Image of 2014 03 10 orford crescent mobility bathroom 5 <h2>2014-03-10 - Wetroom installation in Chelmsford</h2>Image of 2014 03 10 orford crescent mobility bathroom 2 <h2>2014-03-10 - Wetroom installation in Chelmsford</h2>Image of 2014 03 10 orford crescent mobility bathroom 8 <h2>2014-03-10 - Wetroom installation in Chelmsford</h2>Image of 2014 03 10 orford crescent mobility bathroom 7 <h2>2014-03-10 - Wetroom installation in Chelmsford</h2>Image of 2014 03 10 orford crescent mobility bathroom 3 <h2>2014-03-10 - Wetroom installation in Chelmsford</h2>Image of 2014 03 10 orford crescent mobility bathroom 1 <h2>2014-03-10 - Wetroom installation in Chelmsford</h2>

Before any building work can be carried out, detailed plans must be created. The old saying "Measure twice, cut once" springs to mind. Not only do the planning authorities have to be satisfied that the work will be carried out correctly and fit in with neighboring buildings, but also our customers have to be sure that the changes to their home will give them just what they want.

At CWN Construction Ltd, the planning process is a very thorough one, in which our clients are fully involved in order to ensure that their homes fit their needs perfectly, regardless of whether it is a single room such as a kitchen, a garage conversion to create more living space, an extension to the house, or a complete new build. The process always starts with meticulous and interactive planning, bringing customers and designers together.

The image of a paper plan and its corresponding CGI room views is just one example of how customers can 'walk round' their new living space before any work is started. If you have ideas and plans for your home, come and talk them over with us. It's your home, have it your way.

Get More Information

Bricklaying is one of the traditional skills that is becoming harder and harder to find. With the focus at CWN being very much on quality of workmanship, the only way for us to endure business and service continuiuty is to train our own staff. As a master bricklayer and winner of the Golden Trowel award, there is nobody better placed than Craig to make sure that the youngsters learn the right way to approach the job.

The pictures show the latest recruit to the CWN Construction Ltd EarlyBrick training programme being put through his paces by Craig. He is doing a fine job but Craig would rather that he was allowed to get his hand out of the way before the young man tamped down the brick with his trowel.

It may be ten years or more before this young man can contribute to the business full time, but it never hurts to start learning skills at a young age, and he certainly seems to be enjoying his work. Meanwhile, Craig and the team will have to keep soldiering on in the bricklaying department.

Get More Information

Image of 2014 01 17 earlybricklaying 003 <h2>2014-01-17 - It is never too early to start learning</h2>Image of 2014 01 17 earlybricklaying 002 <h2>2014-01-17 - It is never too early to start learning</h2>

2014 - What a start!

Carrying on from where we left off in 2013, we have already received 11 enquiries for building projects to commence this year. Two of these have been confirmed and work will start soon. Busy is good!

The old saying goes “If you want something done, give it to a busy person”. There is a reason that we are so busy; it is simply because over the years, so many happy customers have sung our praises to their friends and families.

If you have a building project, extension, conversion or refurbishment in mind for 2014, get in touch and let us show you why so many people have recommended CWN Construction Ltd. Simply call us on 01245 472087 or click in the header of any page to send us an email.

Get More Information

And relax! The last two projects of 2013 have now been completed and handed over to happy customers. They were a large extension with new kitchen and utility room, and a major garage conversion to give additional family space including bedrooms. As always, these were achieved thanks to great teamwork from planning through to completion.

This has been a fantastic year, both in terms of projects carried out and completing the move into our new office, which has provided the perfect environment to welcome new and existing customers. With the sense of a job well done, the team can now take a well-deserved break before re-commencing activities in 2014

There are already two new building projects to get our teeth into as soon as January comes around and we are all looking forward to an equally busy new year. Once again, many thanks to all our customers and team, wishing all concerned a very merry Christmas and a happy, prosperous 2014.

Get More Information

With the Christmas holidays looming, at the start of December, we had five major building projects under way that needed to be finished before the break.

Three of these have now been completed and handed over to happy customers, leaving us just under two weeks to get the last two works completed before taking a good break and starting on planned projects for 2014.

This has been an incredibly exciting and busy year for us, so the break will be most welcome, but there is a lot to be done before we can relax, so watch this space.

Get More Information

It's good to keep busy. It is also good to find time in your schedule to say "thank you" to the people who keep you busy. Coming up to the end of the year, it is not uncommon for builders to find themselves with little or nothing to do, what with the weather and Christmas bearing down on us like a pack of wolves.

However, thanks to the constant stream of visitors to our new office and a wealth of enquiries from our website as well as personal recommendations from customers, we have a number of projects on the go at the moment that will keep us busy well into the new year.

So, taking a momentary pause, we would like to say "Thank You" to all our customers for entrusting work on their most important asset to CWN Construction Ltd. Likewise, thanks go to all our suppliers for getting the necessary materials to site on time and last but not least, thank you to the team, without whom none of this work would be possible.

Get More Information

Part L of the Building Regulations sets the energy efficiency standards for new homes and requires that a sample of new homes on all developments is tested for air leakage (also known as air tightness, air permeability or air pressure testing).

With everyone's focus being very much on home running costs and energy conservation these days, we went to great lengths to not only meet but to exceed all the energy standards called for in the Building Regulations Section L1A, dealing with fuel and power conservation in new dwellings.

With the final test being the air permeability test, carried out this week, we are proud to say that our efforts were a great success. The regulations stipulate that there must be no more air flow measured than 10m3/(h.m2). The new house showed an air permeability of just 3.5m3/(h.m2), giving a great boost to overall energy efficiency.

The final stage of preparing the house for occupation is commissioning the new high efficiency boiler, which is scheduled for Monday.

Get More Information

The house build project in Witham is now ready for a family to turn it into a home. An open day is arranged for Saturday the 26th of October and our client is confident of finding a buyer. For more details call us on the number above or click in the header of any page to send us an email.

They are so pleased with the results that we are already preparing proposals for two more new build projects for them.

Get More Information

Image of witham new build project finished 1 <h2>2013-10-24 - Witham new build house ready for occupation</h2>Image of witham new build project finished 3 <h2>2013-10-24 - Witham new build house ready for occupation</h2>

Luckily, weekends are normal working days at CWN, so the leak from our exploding water heater in the office was discovered before it had a chance to do any serious damage. The on-demand water heater for the kitchen sink was one of the few things that was left alone when we converted the office.

It ceased to be left alone when we arrived on Saturday morning to find the rugs floating like low-level flying carpets. It seems that the device had decided to show its age by shedding the top of its control tap, allowing mains pressure water through a brand new hole in the front of the casing all through the night.

Luckily, we have a team that can deal with a crisis, and the unit was replaced, water swept away and rugs hung up to dry within an hour.

We are coming to the time of year when burst pipes become more commonplace, so keep our number safe in case of emergency, the team can deal with all aspects of a crisis like flood damage, making good the whole building rather than just stopping the leak and leaving you to get on with it. Whatever your building, plumbing or electrical emergency, you can call us on the number above, or click in the header of any page to email us for a quick response.

Get More Information

Since opening the new office, the stream of visitors coming in to talk over their building plans and ideas has been fantastic. Two new jobs have already been confirmed with many more customers taking away feasibility studies and proposals to help them plan for future works to their homes.

Whether you want to talk about a straightforward building repair, a new kitchen or bathroom designed to your specification, an extension to your home, either through using additional space, or through a loft or garage conversion, or even a complete home building project, you are more than welcome to drop in for an informal chat. If we can help, we will tell you how, if we can't, we will tell you right away, eeping things simple and straightforward.

We can't help feeling that the easy to find location, free, off road parking and relaxed, low pressure atmosphere have helped to make this possible. However, something, somewhere keeps on saying "It must be the coffee". Now, then, where did I put my cup?.

Get More Information

The new buld project in Witham is really starting to look like a home now. The exterior walls are all painted, so the scaffolding can come down as soon as the guttering is in place. Then we can get on with the landscaping and the driveway.

The kitchen has been delivered too. Very shortly, our team of kitchen fitters start work on installing that. Then the home will have a heart and we will be on the final stages of the project and our customers can begin their countdown to moving in.

For more pictures, see the project gallery

Get More Information

It looks like we made a good choice with the location of our new office. In just over a week of operating from the new premises, we have welcomed 8 visitors to talk over a wide range of planned building projects. The project plans provided plenty of variety too, with all stages from exploring initial feasibility right up to bringing in finished architect’s drawings.

Hopefully, by making it easier for people to call in and chat informally in quiet, relaxed surroundings, we will encourage more and more visitors to drop in with their ideas. From small remodelling and repairs or renovation work, to new kitchens and bathroom installations or complete new build projects, all visitors are very welcome.

Get More Information

And here is the interior of our new office. Ready to receive its first visitor. It is great to have all this space to spread out and look at plans in comfort.

Starting off with an empty space is always nice, it lets you plan things the way you want them, the way that is best for the job in hand.

If you would like to talk over a building, extension or conversion project, it would be great to welcome you in and listen to your plans. Please remember though, a good deal of our work is still out on site so calling us in advance is highly recommended so that we can set aside the time to do your project justice. By the way, the coffee here is great too.

For more pictures of the conversion from dress shop to builder's office, take a look at the photo gallery.

Get More Information

It feels good now to have space to match our expanding workload, allowing customers’ plans to be spread out more comfortably and stored more efficiently.

Work and home life are so similar in this respect; everything is easier when you have space to spread out, and carefully planned storage to keep the things you need close at hand when needed, but out of the day when not required.

The entire conversion has taken less than a month to go from the initial drawings to a working environment, despite having one of our busiest periods in terms of projects throughout the moving process. We will look forward to welcoming visitors to the office to talk over their plans as time goes on.

If you are taking a look around you at your living or working space, perhaps thinking that you need bigger premises, how about saving yourself all the upheaval? Talking to the design team here at CWN Construction Ltd could bring out the ideas needed to make the most of extending or remodelling your existing space to make it work your way. Call us on the number shown above or click in the header of any page to send us an email and let us know how your life could be made easier.

Get More Information

The team take a well deserved break for coffee in the van this time. They are looking pretty pleased with themselves, even though they are not occupying the 'luxury' seating that they had last week.

The reason they are looking so happy is the progress made with the bathroom, downstairs cloakroom and en-suite in our new build project in Witham.

Gone are the basins held in place by team members, these have been fitted to the walls now, and are being plumbed in, along with the bath ans shower units. The flooring in the downstairs cloakroom and the en-suite is also coming along very nicely now.

Right lads! Tea break's over! Time to get back to the project. To see more photographs of the fruits of their labours, visit the photo gallery.

Get More Information

At last! Somewhere to sit during breaks. The first internal fittings are going into the bathroom and en-suite shower room of the new build project at Witham.

The sanitary ware being modelled by our team has given welcome relief in more ways than one! We have been reminded that the hand basin stand in this photograph is not included...

There is a sensible side to this though, the reason for adding the human element is to test the practicality of the bathroom design. No matter how good it looks on paper, as a part of the attention to detail that goes into all our projects, having a 'dry run' of the bathroom layout helps to make sure that it will be perfect when everything is fixed in place.

Coming soon, the sitting down will be over and we can get on with the kitchen and plastering the remaining rooms ready for final stages of fitting out.

For less schoolboy humour-ish images from this project, take a look at our photo gallery.

Get More Information

Work has begun on our new office. With the increasing number of projects that are under way, the old office just wasn't quite big enough any more. Everything needs space to create, review and store plans, so CWN Construction Ltd is moving to more spacious premises. Work has just commenced on converting a former fashion shop to a working environment that will make sure there is enough room to give all our customers' projects the space they need to be managed effectively.

How about your own working space? Do you ever feel that you could achieve so much more if you had more space available? Well, you don't have to move to get more space; this can often be achieved just by making better use of the room you already have. Just give us a call, or click in the header of any page to email us and we will be delighted to visit you and give a free, no-obligation quote for making more of your working space.

Get More Information

The 150 pieces of staircase puzzle that arrived last week have now been assembled and the stairs are in place. Work is progressing nicely with the internal walls and the plasterers have started work to make them smooth and ready for decorating and fitting out the bathroom and kitchen before decorating.

To see more of how this project is progressing, visit our the project gallery.

Get More Information

If you are fascinated by puzzles, you would love working for CWN Construction Ltd this week! The staircase for our new build project in Witham has arrived - in 150 pieces! Luckily, we have a team of skilled joiners who will have it installed in next to no time.

Meanwhile, the upstairs inner walls are all in place ready for plastering. The house is starting to take shape now and we are all getting very excited in anticipation of the next stages.

Get More Information

With the recent good weather, fantastic teamwork and efficient co-ordination, all seven of the jobs currently under way are running along smoothly. One project was completed this week, with another due for handover before the weekend.

Many thanks to all concerned for keeping productivity bang on target all the way down the line. When managing a range of building jobs from a kitchen installation to building a complete house, resources and people all have to be in the right place at the right time to make sure that our customers are happy.

Even bigger thanks to all our customers!

Get More Information

With the roof on and the windows in, this is really starting to look more like a house every day. Once again we have to applaud the teamwork of all concerned who have been pulling out all the stops to make real progress while the good weather has lasted.

For more views of this project, visit our gallery.

Coming soon: Work gets started on the interior.

Get More Information

Use of cookies. Mouse over here for details.

Use of cookies on this web site: CWN Construction Ltd collects no personally identifiable data in cookies. However, a number of social media and search engine companies place tracking cookies without our consent or co-operation. If you wish to avoid tracking, please read our cookies policy, where you will find links to resources that will help you set your browser accordingly.
Show Cookies Policy
Accept & Continue
Join Mailing List
Montagu Gardens House Refurbishment | Extension & Redesign in Beaulieu Park | 2-Storey Extension Fifth Avenue | Stone House Extension | Refurbishment | Kitchens | Great Notley Kitchen | Bathrooms | Garage Conversion | Extensions | New Build/Self Build | Interior Design | Tiling & Decorating | Danbury Kitchen | Chelmsford Bathroom | Architectural Design & Planning | Kitchen Refurbishment in Chelmsford | Refurbishment of House in Great Baddow | Bungalow Extension in Colchester, Essex | Side & Rear House Extension, Leigh on Sea | Extension & New Kitchen, Chelmsford | Garage Conversion in Great Notley | Bathroom En-Suite and House Decoration | New Bathroom and en-Suite | Extension in Galleywood | Latest Interior Design Project | Home | Services | Projects | About Us | Contact | Areas Served | Links | Image Gallery | Data Protection© Content copyright CWN Construction Ltd 2024    Sitemap   Layout and CMS ©The Village Websmith  contact websmith Page generated in 0.0225 seconds.